- Merge from a transfer case lubricant liquid.
- Remove forward section of system of production of the fulfilled gases and the thermofilter.
- Remove the forward driveshaft (see. Removal and installation of driveshafts).
|
- By means of a special key release a lock-nut of a connecting flange.
|
|
|
The lock-nut is subject to replacement without fail. |
|
- With paint mark the provision of a connecting flange of rather carving pin.
|
|
- Remove a connecting flange by means of a stripper.
|
|
- Having used the special adaptation take an epiploon from a forward casing.
|
|
- Establish a new epiploon, previously having greased its sealing sponges with universal greasing.
- Establish a connecting flange.
|
- Tighten a lock-nut of a connecting flange with demanded effort.
|
|
- Establish the driveshaft.
- Installation of the remained components is made as it should be, the return to an order of their dismantle.
|