4.5. Removal and installation of the inlet pipeline
|
- Dump pressure in a power supply system (see. Check of kompressionny pressure in cylinders).
- Empty cooling system (see. Head Routine maintenance).
- Disconnect from a collector of the inlet pipeline cables of a drive of a butterfly valve and темпостата.
- Remove an air line sleeve.
- Remove disturbing to access to the inlet pipeline lines of communication:
- Electroconducting of valve IACV ААС, sensor of provision of a butterfly valve (TPS), sensor switch of extreme provisions of a butterfly valve, coil of ignition, powerful transistor, electromagnetic EGRC valve and sensor of temperature of EGR;
- The hoses of an okhladitelny path brought to a collector;
- Hoses of a heating path;
- PCV hose (from the right head of cylinders);
- Vacuum hoses of a coal adsorber, GTTs and pressure regulator;
- Hose of a purge of a coal adsorber;
- EGR tube;
- Grounding tires;
- Turn out fixing bolts and remove a collector of the inlet pipeline with sealing laying.
|
- Disconnect from the fuel highway submitting and returnable gasoline pipe lines, disconnect electroconducting from all injectors and remove the fuel highway.
|
|
- Operating in strictly certain order, release bolts of fastening of the inlet pipeline.
|
|
- Finally turn out fixing bolts and remove the pipeline.
- In case of need remove from a collector of the inlet pipeline the throttle case.
|
|
Installation
Installation is made as it should be, the return to an order of dismantle of components — do not forget to make replacement of all sealing and insulating elements. Track, that all fixture was tightened with demanded effort.
|
|
The tightening of bolts of fastening of the inlet pipeline is made evenly as it should be, the return to an order of their easing. |
|
|
|